BIM Technology Road Map

facility-life-cycle-technology-and-process-roadmap1-300x172It’s the integration of Cloud Computing, BIM, and Efficient Collaborative Construction Delivery Methods (IPD, JOC, PPP…) that will improve productivity in the AECO sector.

Project Delivery Methods of the Future

via http://www.4Clicks.com – Leading cost estimating and efficient project delivery software solutions for JOC, SABER, IDIQ, MATOC, SATOC, MACC, POCA, BOA, BOS … featuring and exclusively enhanced 400,000 line item RSMeans Cost Database, visual estimating / automatic quantity take off ( QTO), contract, project, and document management, all in one application.

BIM is NOT 3D Visualization – 4D, 5D …..

Building Information Modeling, BIM, is the life-cycle management of the built environment supported by digital technology.  As such, the core requirements of BIM include collaboration, standardized information, multiple domain competencies, and several supporting interoperable technologies.

Let’s face it, BIM continues to languish.  Sure a lot of architects use it for pretty pictures to win business, and there are several “case studies” surrounding clash detection, etc. etc.   However, life-cycle and/or ongoing facility management using BIM?  No so much.

This is not only sad but economically and environmentally imprudent.   The efficient life-cycle management of the built environment is critical to both global competitiveness and preserving sustainable resources.

Why is BIM of to a slow start?  Too much focus on 3D visualization, too much “reinventing the wheel” trying to fit a square peg in a round hole, and virtually NO EMPHASIS upon the requirements for life-cycle management… associated competencies, domains, technologies, ongoing collaboration, integration, and continuous improvement.

Design-bid-build and “low bid” awards are the downfall of the Architecture, Engineering, Construction, Owner, and Operations sector.   The method is antagonistic, wasteful, and typically delivers poor initial and ongoing results.

Focus upon CHANGE MANAGEMENT and building awareness relative to both COLLABORATIVE CONSTRUCTION DELIVERY METHODS AND LIFECYCLE, TOTAL COST OF OWNERSHIP MANAGMENT is the only thing that will “kick start” BIM.

Integrated Project Delivery (IPD) and Job Order Contracting (JOC) are both collaborative construction delivery methods that have been proven for decades, however, awareness remains low.  IPD’s focus is upon major new construction, while JOC focuses upon the numerous renovation, repair, sustainability, and minor new construction projects so critical to efficient use of our current infrastructure.

The below diagram outlines the competencies, technologies, and process required for the lifecycle management of the built environment.

BIMF - Building Information Management Framework

via http://www.4clicks.com – Premier cost estimating and efficient project delivery technology solutions for JOC, SABER, IDIQ, SATOC, MATOC, MACC, POCA, BOS, BOS…  Featuring an exclusively enhanced 400,000+ line item RSMeans Cost database, document/contract/project management, and visual estimating / electronic quantity take-off, QTO.

Construction Disruption – BIM, Cloud Computing, and Efficient Project Delivery Methods

By Peter Cholakis
Published in the March 2013 issue of Today’s Facility Manager

Emergent disruptive technologies and construction delivery methods are altering both the culture and day-to-day practices of the construction, renovation, repair, and sustainability of the built environment. Meanwhile, a shifting economic and environmental landscape dictates significantly improved efficiencies relative to these facility related activities. This is especially important to any organization dependent upon its facilities and infrastructure to support and maintain its core mission.

The disruptive digital technologies of building information modeling (BIM) and cloud computing, combined with emergent collaborative construction delivery methods are poised to alter the status quo, ushering in increased levels of collaboration and transparency. A disruptive technology is one that alters the very fabric of a business process or way of life, displacing whatever previously stood in its place. BIM and cloud computing fit the profile of disruptive technologies, individually, and when combined these stand to create a tidal wave of change.

BIM is the life cycle management of the built environment, supported by digital technology. While a great deal of emphasis has been placed upon 3D visualization, this is just a component of BIM. The shift from a “first cost mentality” to a life cycle cost or total cost of ownership is a huge change for many. Improving decision making practices and applying standardized terms, metrics, and cost data can also prove challenging. An understanding and integration of the associated knowledge domains important to life cycle management is required, resulting in what is now being referred to as “big data.”

Cloud computing is also a disruptive technology, and it’s one that impacts several areas. The National Institute of Standards and Technology (NIST) definition of cloud computing is as follows, “Cloud computing is a model for enabling ubiquitous, convenient, on demand network access to a shared pool of configurable computing resources (e.g., networks, servers, storage, applications, services) that can be rapidly provisioned and released with minimal management effort or service provider interaction. The cloud model is composed of five essential characteristics, three service models, and four deployment models.”

It is perhaps helpful to define cloud computing in terms of its benefits. Cloud computing enables far greater levels of collaboration, transparency, and information access previously unavailable by traditional client/server, database, or even prior generation web applications. Multiple users can work on the same data set with anyone, anywhere, anytime, in multicurrency, multilanguage environments. All changes can be tracked to “who did what” within seconds (potentially the best form of security available), and information is never deleted.

The disruptive technologies of BIM and cloud computing will accelerate the adoption of emergent construction delivery methods and foster new frameworks. Design-bid-build, the traditional construction delivery method for decades, is inherently flawed. As a lowest bid deployment it immediately sets up adversarial relationships for involved parties. Owners prepare a solicitation for construction projects based on their understanding of them1, with or without third-party A/E assistance, and in most cases they go out in search of the lowest bidder. Then without a thorough understanding of the owner’s facility, bidders base their responses on the owner’s solicitation, plans, and specifications. Owners typically allow a period of time for bidders’ questions and clarifications; but the quality of this interchange is at best questionable if based solely on a written scope, plans and specifications, and/or a meeting with suppliers.

Design-build, arguably a step in right direction, falls short of bringing all stakeholders together. More responsibility of design and construction is shifted to the contractor and/or A/E. However, the dual level participation structure doesn’t assure the interests of all parties are equally addressed. Furthermore, the design-build process is typically reserved for major new construction projects versus the numerous sustainability, repair, renovation projects, and minor new construction projects typically encountered by facility managers (fms).

Because BIM brings together previously disparate information into a framework that enables decision support, using the technology requires a collaborative construction delivery method. The integration of the domain knowledge and robust processes required to allow fms, A/Es, and other stakeholders to achieve heightened levels of information sharing and collaboration is enabled by methods that include Integrated Project Delivery (IPD) and Job Order Contracting (JOC).

Key characteristics of these emergent construction delivery methods include: choices based on best value; some form of pricing transparency; early and ongoing information sharing among project stakeholders; appropriate distribution of risk; and some form of financial incentive to drive performance.

Both IPD and JOC allow, if not require, owner cost estimators and project managers to “partner” with contractors, subcontractors, and A/Es to conceptualize, create, cost, prioritize, start, and report upon projects—in the very early phases of construction.

IPD, JOC, and Simplified Acquisition of Base Civil Engineering Requirements (SABER)—the U.S. Air Force term for applying JOC practices—are practiced simultaneously by a growing number of organizations and supported by digital technologies. These construction delivery processes are embedded within software to allow for rapid, cost-effective, and consistent deployment as well as the associated level of collaboration and transparency.

BIM and cloud computing are disruptive technologies that will accelerate the adoption of emergent construction delivery methods such as IPD and JOC. Construction delivery methods set the tone and level of interaction among project participants and can be viewed as the management process framework. When supported by BIM and cloud computing, the life cycle management of the built environment, and the associated management of big data, can be expected to become commonplace for many construction projects.

1303 profdev a 150x150 Professional Development: Construction Disruption

Cholakis

Cholakis is chief marketing officer for 4Clicks Solutions, LLC, a Colorado Springs, CO provider of cost estimating and project management software. With expertise in facilities life cycle costs and total cost of ownership in various market segments, he is involved in numerous industry associations and committees including the American Society of Safety Engineers, Association for the Advancement of Cost Engineering, Society of American Military Engineers, BIM Library Committee-National Institute for Building Sciences (NIBS), and National Building Information Model Standard Project Committee.

1 “The Art of Thinking Outside the Box;” Vince Duobinis; 2008.

Building Information Management Framework – BIMF – People, Process, Technology

While at first perhaps a bit intimidating…  illustrating the life-cycle management within a BIM context is relatively straightforward.

BIM – Life-cycle Management Perspective

BIMF - Building Information Management Framework

 

The purpose of this Framework is to provide  a general guide that your team can quickly customize to your specific requirements.   Like a restaurant menu or a travel guide, you can visualize the resources available and decide on an appropriate strategic configuration of options.

Just begin in the Center and work thru this Action Agenda using, when available and appropriate, tested  processes and templates.   Using these guidelines, set up a BIM Management structure with your stakeholders.

 The Building Information Management Framework (BIMF) illustrates a how people, processes, and technology interact to support the built environment throughout its life-cycle.  Based upon the associated level of detail, an operating model can be developed to more efficiently identify,  prioritize, and meet the current and future needs of built environment stakeholders (Owners, AE’s, Contractors, Occupants, Oversight Groups…)

More specifically, modular, Model View Definitions (MVD), associated exchange specifications and common data architectures [for example: Industry Foundation Class (IFC), OMNICLASS] can  help to integrate multi-discipline Architecture, Engineering, Construction (AEC) “activities”,  “business processes”, “associated competencies” and “supporting technologies”  to meet overall requirements with a goal of continuous improvement.

WORK GROUP FORMATION – Roles and Relationships;

PROCESS MAP – who does what, in which sequence, and why;

EXCHANGE REQUIREMENTS & BASIC BUSINESS RULES – Overall guidelines for information integration

EXCHANGE REQUIREMENT MODELS – Specific information “maps”

GENERIC MODEL VIEW DEFINTION (MVD) – Strategic approach incorporating guidelines for information format, content, and use;

MODEL VIEW DEFINTION & IMPLEMENTATION SPECIFICATIONS   – Specific format, content, and use

PROJECT AGREEMENT REQUIREMENTS – LEVEL OF DEVELOPMENT (LOD) – Defined “project” deliverables

(Adapted from: IMPROVING THE ROBUSTNESS OF MODEL EXCHANGES USING PRODUCT MODELING ‘CONCEPTS’ FOR IFC SCHEMA -Manu Venugopal, Charles Eastman, Rafael Sacks, and Jochen Teizer – with ongoing assistance/input from NBIMS3.0 Terminology Subcommittee)

Model View Definitions (MVD) and associated exchange specifications, provide the best benefit if they are modular and reusable and developed from Industry Foundation Class (IFC) Product Modeling Concepts.   Model views and overall life-cycle management are similar in this regard.

Building Information Modeling (BIM) tools serving the Architecture, Engineering, Construction (AEC) span multiple  “activities”,  “business processes”, “associated competencies” and “supporting technologies”, and each may required different internal data model representation to suit each domain.  Data exchange is therefore a critical aspect.   Inter and intra domain standardized data architectures and associated adoption of matching robust processes are really the first step toward successfully managing the built environment.

The Process Side of BIM = Collaboration: People, Process, & Technology

BIM Requires IPD.

BIM requires some form of Integrated Project Delivery… Period.   Why you say?

Simple.  BIM is the life-cycle management of the built environment supported by digital technology.  BIM therefore, requires the integration of multiple knowledge domains, stakeholders and supporting technologies… from strategic and capital planning, through design, construction, operations, utilization, repair, renovation, adaptation, maintenance, and deconstruction.

Efficient project delivery methods such as IPD and Job Order Contracting (JOC) are integral components of efficiently managing the built environment over time.  The help define the specialized framework needed to enable Owners, AEs, Contractors, Oversight Groups, and other Stakeholders share information and collaborate to enable the appropriate distribution of resources needed to optimize the physical and function conditions of the built environments.

BIG DATA = BIM

BIG DATA = BIM

Via http://www.4Clicks.com – Premier cost estimating and efficient project delivery software supporting IPD, JOC, SABER, IDIQ, SATOC, MACC, POCA, BOA and featuring and exclusive 400,000 line item enhancement of RSMeans cost data with modifiers and full descriptions as well as integrated visual esimating/QTO, and contract, project, and document management…. all in one application.

BIM – Getting it Right

A BIM is a digital representation of physical and functional characteristics of a facility. As such it serves as a shared knowledge resource for information about a facility forming a reliable basis for decisions during its lifecycle from inception onward.” – buildingSMARTalliance – NBIMS – NIBS

Early definitions which assert that BIM is simply a 3D model of a facility are far from the truth and do not adequately communicate the potential of digital, object-based, interoperable building information modeling processes and tools and modern communications methods.- buildingSMARTalliance – NBIMS – NIBS

If implemented, nearly every piece of information that an owner needs about a facility throughout its life can be made available electronically. – buildingSMARTalliance – NBIMS – NIBS

BIM STRATEGY – TOP TEN LIST
1.Coordinate and plan with all parties before you start – Efficient, collaborative project delivery methods ( IPD, JOC) are critical to success.
2.Ensure all parties have life cycle view – involve them early and often – Owners, AEs, Contractors, Facility Management, Users, Community, Stakeholders/Oversight Groups
3.Build the model then build to the model
4.Detailed data can be summarized (The reverse is not possible)
5.Enter data one time then improve and refine over life
6.Build data sustainability into business process – keep data alive.  Ongoing process – Continuous improvement!
7.Use information assurance and metadata to build trust – know data sources and users
8.Contract for data – good contracts make good projects
9.Ensure data is externally accessible yet protected
10.Use international standards and cloud storage to ensure long term accessibility

via http://www.4Clicks.com – premier cost estimating and efficient project delivery software for JOC, SABER, IPD, IDIQ, SATOC, MATOC, MACC, POCA, BOA

BIG DATA = BIM

BIG DATA = BIM

Sustainability of DOD Buildings – Reuse of Existing Buildings

Reusing existing buildings achieves a 15%+ higher return on investment and 20% reduction in greenhouse gases.   It is less  costly and more sustainable to reuse existing buildings.

With 345,000 buildings, with over 105,000 buildings more than 50 years old, the importance of efficient renovation, repair, and sustainability of existing buildings is paramount.

DoD Building Treatment Terms
•“Adaptive reuse & rehabilitation” are terms of art outside DoD
•The DoD term for “major rehabilitation” is “modernization”
•Modernization means: “the alteration or replacement of facilities solely to implement new or higher standards to accommodate new functions or to replace a building component that typically lasts more than 50 years.”
•This study compares the costs and GHG of modernization with new construction

Sustainment/Status Quo
•Formulated for measuring baseline energy consumption
Demolition and New Construction
•LEED Silver certifiable construction – 2009 LEED for New Construction and Major Renovations
Full Modernization with Strict Application of Historic Preservation Standards (HPS)
•Full modernization with a strict application of Historic Preservation Standards ( HPS) and other DoD facility design standards
•LEED Silver
Full Modernization with Strict Application of AT/FP
•Full rehabilitation/modernization but with strict application of Anti-terrorism/ Force Protection requirements through building hardening, seismic and other DoD facility design standards
•LEED Silver

Applicable design standards include:

  • Whole Building Design
  • UFC 1-200-01 General Building Requirements
  • UFC 4-610-01 Administrative Facilities
  • UFC 1-900-01 Selection of Methods for the Reduction, Reuse and Recycling of Demolition Waste
  • UFC 3-310-04 Seismic Design for Buildings
  • DoD Minimum Antiterrorism Force Protection Standards for Buildings
  • Secretary of Interior’s Standards for Rehabilitation of Historic Buildings

Findings

  • DoD’s Pre-War masonry buildings are an underutilized resource for meeting DoD GHG carbon reduction goals
  • ATFP and Progressive Collapse requirements tend to be rigidly and prescriptively applied, raising construction costs and introducing additional Scope 3 GHG emissions
  • Prior modernization treatments result in loss of original energy saving design features in Pre-War Buildings
  • Differences in GHG in alternatives resulted from the amount of new building materials introduced and transportation of demolition debris
  • Cost estimates and construction bid requests should include materials quantities in addition to costs to evaluate and validate GHG impacts.
  • Design professionals with practical experience with archaic building materials and systems are critical to the development of accurate planning level specifications
  • GHG emission tradeoffs of proposed new materials and building options should be evaluated early in the conceptual design process

Recommendations

  • Incorporate life-cycle GHG emissions analysis into DoD MILCON and SRM programs
  • Invest in formulation of carbon calculator system
  • Place more emphasis on existing buildings as viable project alternatives to meet mission requirements
  • Identify characteristic strengths and vulnerabilities by class of building
    Place more emphasis on existing buildings to meet DoD energy reduction goals
  • Avoid modernization treatments that result in loss of original energy saving design features in Pre-War Buildings

Green House Gas - Benefits of Building Re-use vs. New Construction

Efficient project delivery methods are of critical importance to the task of sustainability and life-cycle management of the built environment.   Job Order Contracting ( JOC ), and SABER are proven project delivery methods for renovation, repair, sustainability, and minor new construction.  JOC and SABER are a form of Integrated Project Delivery for existing buildings and infrastructure.

JOC and SABER provide the following advantages to building portfolio Owners:

•Fast and timely delivery of projects.
•Consolidation of procurement – lower overhead cost and procurement cost.
•Contractor and owner efficiencies in prosecution of the work.  Development of a partner relationship based on work performance.
•Virtual elimination of legal disputes, claims and mitigation of change orders.
•Standard pricing and specification utilizing a published unit price book (UPB), typcially RSMeans-based, resulting in efficient and effective estimating, design, and fixed price construction.
A bit more about JOC -
  1. “IPD Lite” for Existing Buildings.
  2. Consolidates procurement to shorten Project Timelines and reduce procurement costs.
  3. Transparency of pricing and procurement compliance through Unit Price Book.  Owner creates internal estimating (IGE)
  4. Long Term Facility Relationship increases productivity and enables reiterative process improvements.
  5. Quality and performance incentivized through IDIQ form of contract with minimal guarantee and clear maximum volume.

Traditional Project Delivery vs. Integrated Project Delivery

via.www.4Clicks.com – Premier cost estimating and efficient project delivery software and services for JOC, SABER, SATOC, IDIQ, MATOC, MACC, POCA, and BOA.  Featurings:

  • Exclusive 400,000 line item enhancement of RSMeans Cost Data
  • Automated Technical Evaluations
  • Contract, Project, Estimating, Document Management
  • Visual Estimating

TCO - Green House Gas

Legal and Policy Framework
•National Historic Preservation Act of 1966 ( Amended)
•Energy Policy Act of 2005
•Energy Independence and Security Act of 2007
•Executive Order 13423: Federal Environment, Energy, and Transportation Management (2007)
•Executive Order 13514: Federal Leadership in Environment, Energy, Economic Performance (2009)

AGC – Job Order Contracting Webinar – March 12, 2013

Webinar:   Job Order Contracting

Tuesday, March 12, 2013 – 2:00pm to 3:30pmJOC Process

Job Order Contracting (JOC) is an innovative delivery method focused on the renovation and repair of large facility infrastructure under a long-term contract.   JOC has been around for a long time but is experiencing an upswing in an era of limited capital dollars and greater efficiency.   Like IPD, JOC focuses on relational contracting, an integrated team, and performance incentives, but JOC is unique in its unit-price structure and repetitive delivery order process.  This webinar will demystify unit pricing, coefficient development, job order scoping and estimating process, and skillsets needed to succeed in JOC. The current JOC market will be framed, with an emphasis on serving owners throughout the building life-cycle.

During this webinar, participants will learn about:

  • Compare Job Order Contracting (JOC) to other well-known delivery methods.
  • Describe the pricing structure of JOC, identify strategies for developing a coefficient, and understand the basics of line item estimating.
  • Discuss the JOC delivery order process, including scoping, proposal preparation, and execution.
  • Identify current JOC market opportunities and dynamics, including market segments, contract structure, unit price books, consultants, etc.
  • Determine skillsets and culture to be a successful JOC contractor..

Speakers

Lisa Cooley
Consultant, LEED AP

Perfecto Solis
Vice-President of Airport Development and Engineering, DFW Airport

Leo Wright
Vice-President of Job Order Contracting Division, F.H. Paschen

 

 


Any questions or changes to your registration should be made via email to meetings@agc.org.

via http://www.4Clicks.com – Premier Cost Estimating and Efficient Project Delivery Technology for JOC, SABER, IDIQ, IPD, SATOC, MATOC, POCA, BOA.

The Business Value of BIM in North America 2007 – 2012

The Emperor is still naked!

Is the trend analysis of the Business Value of BIM in North America from 2007 through 2012  reality, or are many of us walking around with rose colored glasses?

I ask you, do you really believe the following statement ” Now in 2012, 71% of architects, engineers, contractors, and owners report they have become engaged with BIM on their projects …”.    If you define BIM as the life-cycle management of the built environment supported by digital technology, I can tell you that either the survey is flawed… a lot of people don’t know what BIM is… or we have a lot of folks inflating the truth.   There is NO WAY 71% of ANY of the groups are “engaged with BIM on their projects”…period, end of story.

Playing with Statistics?   The 71% average appears to have been calculated by taking a simple average of the “adoption rate” from architects, engineers, and contractors” from three size classes of firms “small, medium, and large”.   If I am correct, this is just plan WRONG.   Most firms in the U.S. are small business, thus a weighted average must be applied.   The “adoption rate” for small firms 50%… a number I also believe to be inaccurate.

I just came back from the NIBS Conference.   This is without question, the most valuable, authoritative meeting relative to BIM in the United States.  How many people were there you might ask?   A few hundred at most.

So, what does any of this matter?   Simple really.   Until our industry stops the hype and focus on important issues relative to BIM, we will continue to be mired in inaction.   The AECOO is the most unproductive business sector and also has the lowest rate of technology adoption.  These are facts….   if one wishes to be interested in facts that is.

Here some thoughts as to where emphasis must be placed:

  1. Greater adoption and use of collaborative construction delivery methods:  IPD – Integrated Project Delivery, and JOC – Job Order Contracting.  The later is a form of IPD specifically targeting renovation, repair, sustainability, and minor new construction projects.   Let’s face it, 80% or more of all funding for the built environment will be going in renovation, repair, and sustainability.
  2. Emphasis on business process, strategy, and standardized terms, metrics, and data architecture vs. technology.   Technology is NOT the problem, is the lack of clear, robust business strategy and processes, and domain knowledge… largely on the part of Owners that is the primary obstacle to progressive change.   Owners write the checks, they are “where the buck stops”.
  3. Focus upon life-cycle costs / total cost of ownership, vs. first costs.
  4. A bit more on data standards….   OMNICLASS, UNIFORMAT, MASTERFORMAT, COie, IFC, et al… all have there roll.  Some will survive, some may not.   The point is that unless we have standardized terms, definitions, detailed reference and actual cost information (localized materials, equipment, and labors), physical and functional condition metrics, etc. etc. etc.    …  we can’t collaborate or improve productivity!
  5. Participation by all stakeholders – Owners, AE’s, Contractors, SubContractors, Building Users, Oversight Groups, Regulatory Bodies, Building Product Manufacturers, Communities, ….

ROI -BIM

 

 

 

 

2013-WSP Group

2013-WSP Group

BIG DATA = BIM

BIG DATA = BIM

Is Cloud Computing More Important than BIM?

Is focus upon the 3D component of BIM an unfortunate distraction?

BIM, Building Information Modeling is the ability to create a dynamic information model of the built environment (above and below ground, inside and out, horizontal and vertical physical infrastructure) for use in all real property related activities:  concept,  rapid prototyping, planning, design, engineering, construction, physical and functional condition monitoring and management, financing, capital reinvestment, insurance, facility management, renovation, repair, sustainability, utilization, leasing, valuation, procurement, sale and decommissioning  with appropriate shared, secure, and collaborative information access and use.

The advent of Cloud Computing, combined with the cost to capture, store, and process information  falling to near zero,  is enabling new capabilities for secure, real-time collaboration.

The altered world landscape relative to the built environment is upon us all.  In addition to technology changes that are altering the ways we interact and conduct business on fundamental basis, there are economic and environmental imperatives.   All of which lead to the AECOO (Architecture, Engineering, Construction, Operations and Owner) sector and its stakeholdings needing to collaborate to achieve better, quicker outcome,  at less cost,  and with less risk.

Key challenges to BIM in terms of its true potential, the life-cycle management of the built environment, include:

- The development of uniform standard process, terminology, and technology environments for the new BIG DATA world , encompassing  all  ‘built environment related knowledge domains, competencies, and activities.   

- Clear organization and classifications of information and associated access  rights and rights to use, enabling appropriate, uniform basis intra and international use.

- Workflow-based  Cloud-computing services environments, and plug-ins that are vs.  monolithic traditional software frameworks which are web enabled via virtual server, or even traditional 3-tier web applications such as .NET.   4-tier applications are needed with the ability to link and reuse  information in any manner  relative  to identity/location, building, area, floor, room, occupancy, use, physical and functional conditions,  standardized and actual costs (material, equipment, and labor), et al… – to provide common ‘highly secure’  models for short and long term decision support.

– The acceptance and increased use of collaborative construction delivery methods such as Integrated Project Delivery (IPD) and Job Order Contracting (JOC).  The latter a form of IPD specifically targeting facility renovation, repair, sustainability, and minor new construction projects.

-  AUTHENTICATION, ACCESS CONTROL, COLLABORATION, AND STANDARDS …  4Clicks Solutions is about to release a powerful new Cloud Computing solution called CEASEL. It focuses upon transparent construction cost estimating and efficient project delivery.  Each user to controls their own ‘domain’ and access policies (ie ‘who’ can access ‘what’ data, ‘when’ and ‘how’ ). Data in NEVER deleted and  ALL user access and activities are tracked.. .the best form of security.    “Data independency” and  appropriate access for all asset owners, managers, and service providers is supported.   Project development time is reduced because users don’t need to create an identity store and access control system for each project, and projects, estimates, etc. can easily be updated and re-used.

New authentication methods or new kinds of user credentials can be adopted by upgrading just the authentication service.  Associated contracts,  projects, and estimates don’t need to be re-coded.  Changes to access control policy can be made quicker and more easily because it is consolidated in the one place. 

Dedicated and focused security service leads to better overall security – compared with each organization having a part-time resource for security management. 

Security improvements benefit all projects at the same time. 

Less time and effort is devoted to security administration as administrators only need to understand and use one security framework rather than a different one for each project.

Errors are reduced because there is no duplication of identity data and access control policy.A unified view of identity and access control policy is achieved for each user, without breaching the security of other users.

Simplified , auditing and reporting.

If you are interesting in being a pilot user of this new capability, please contact me directly.