Detailed Line Item Unit Cost Construction Estimating, Public Sector, & Unit Price Books – UPB – UPG


” Definition: detailed cost estimate: “a forecast of construction cost prepared on the basis of a detailed analysis of materials and labor for all items of work.”  – 13th edition of the Architect’s Handbook of Professional Practice

A detailed unit cost line item construction cost estimate involves a  review and understanding of the scope of work of the associated project including all possible factors and risks.

Materials, labor, and equipment as well as associated costs are provided in highest level of granularity.

Anticipated productivity is also a key element.  The latter can be affected by multiple variables such as labor composition and availability, weather, site access, materials availability, etc.

Owners – Detailed unit price line time estimates are required by public agencies for most  IDIQ construction projects.  If the project exceeds are specified dollar threshold, the an independent owner estimate must also be created (also call an independent government estimate – IGE).  Line item estimates are also used to create and validate construction budgets.

Contractors – Detailed unit price line estimates are used to bid jobs and also done by general contractors and construction managers to validate bids from sub contractors.  They are also associated with progress reporting and invoicing.

Required Skills – Field experience at construction sites is extremely important as it is perhaps the only way to gain a true appreciation of risk factors and other variables that can impact a construction project.  In addition, the ability to review and interpret construction drawings, work with cost estimating formulas and technologies, communicate information to disparate disciplines and audiences, and attention to detail are all additional requirements.

Process Tasks  – Processes associated with creating a line item construction cost estimate include the following:

  • Definition of services to be provided
  • Estimate preparation
  • Validation of contents and assumptions
  • Estimate reconciliation (if multiple estimates are required for a project)
  • Documenting and associated presentation of the estimate

Defining the scope of services in itself requires several considerations such as identifying inclusions and exclusions, defining the basis to be used for pricing (construction cost databases and/or unit price books – UPB, unit price guides, subcontractor quotes), presentation of line items as bare costs or inclusive of overhead and profit,  classification system to be used, i.e. CSI MasterFormat, Uniformat II, WBS, etc, and format of the estimate (summary level, detailed level, price vs. non pre-priced items, associated formulas, source of each line item).

Collaboration among construction project participants and/or stakeholder is critical to assuring a proper definition of the scope of services, and thus mandatory if the estimate is to reflect the expectations of the owners, design, contractor, etc.  As one might expect, achieving the best possible outcome for the estimate and the overall construction project is dependent upon the processes involved in gathering accurate information in a timely manner and to employ the actions and philosophies associate with continuous improvement and LEAN best management practices.

The following is a graphic noting some of the items that may be considered in the creation of a construction cost estimate.

unit price book - upb

Multiple construction delivery methods require line item construction cost estimates.  Job Order Contracting – JOC, for example, requires the use of line item unit price book – UPB and/or unit price guide – UPB.   Unit prices books are typically updated annually and quarterly price adjustments may also be applied by specified processes and factors.

job order contracting

CONE OF UNCERTAINTY – (Source:GAO)

job order contracting unit price bookhttp://www.4Clicks.com